SAP ABAP Data Element CK_LPLPR (Current Planned Price)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element CK_LPLPR
Short Description Current Planned Price  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERT11    
Data Type CURR   Currency field, stored as DEC 
Length 11    
Decimal Places 2    
Output Length 14    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 CrtPlanPrc 
Medium 15 Crnt Plan Price 
Long 20 Current Plan Price 
Heading 14 Crt Plan Price 
Documentation

Definition

Price calculated in a standard cost estimate that has been released.

Use

The price calculated in a standard cost estimate that has been released is written to both the Current planned price field and the Current standard price field.

The price in the Current planned price field remains constant until the standard cost estimate is released in the next period. The current planned price documents the valuation of the material in the itemization of the standard cost estimate for the higher-level material for the period.

If the standard price is changed manually during the period, all material stocks are revaluated with the new standard price. Manually changing the standard price will change the price in the Current standard price field but not the price in the Current planned price field.

If the standard cost estimate is released for the next period, both fields are updated with the new price from the standard cost estimate.

In mateial costing, you can define a strategy for material valuation that accesses the value in the Current planned price field.

Material movements are valuated with the price in the Current standard price field.

Procedure

Examples

Dependencies

History
Last changed by/on SAP  19970812 
SAP Release Created in