SAP ABAP Data Element CK_KADKY (Costing Date (Key))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element | CK_KADKY |
Short Description | Costing Date (Key) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CK_KADAT | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | KKK | |
Default Component name | CSTG_DATE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Cstg Date |
Medium | 15 | Costing Date |
Long | 20 | Costing Date |
Heading | 55 | Costing Date (Key) |
Documentation
Definition
Date or period that determines the beginning of validity for a cost estimate. The date or period becomes part of the key when the cost estimate is saved.
Use
The following indicators in the costing type control whether a date becomes part of the key when cost estimates are saved in material costing:
- If Without date is set, the cost estimate will be saved without a date.
- If With date is set, the cost estimate will be saved with the current date.
- If With start of period is set, the cost estimate will be saved with the date of the first day of the period. In this case, it is possible to update the standard price in the material master record.
Procedure
To access a cost estimate using the date as a selection criterion:
- For cost estimates saved without date, leave the field blank
- For cost estimates saved with date, enter the exact date
- For cost estimates saved with start of period, enter the first day of the period in which you want to search for a cost estimate
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |