SAP ABAP Data Element CK_ELESMNS (Cost Component Structure for Auxiliary Cost Component Split)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element CK_ELESMNS
Short Description Cost Component Structure for Auxiliary Cost Component Split  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CK_ELESMHK    
Data Type CHAR   Character String 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table TCKH4    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 CSTCOMPSTR 
Medium 15 Cost Comp. Str. 
Long 40 Cost Comp Struct. (Aux. Cost Comp Split) 
Heading 34 CCompStr. for Aux. Cost Comp Split 
Documentation

Definition

You can cost two cost components splits simultaneously. To do this, define one split as the main cost cost component split; the second split becomes the auxiliary cost component split.

Use

This enables you to cost, for example, a primary cost component split and a cost component split for cost of goods manufactured at the same time. It is also possible to create only one primary cost component split or one cost component split for cost of goods manufactured.

Procedure

Enter the number of the cost component structure for the auxiliary cost component split, if you want to cost a second cost component split parallel to the main one.

Examples

Dependencies

History
Last changed by/on SAP  19981109 
SAP Release Created in