SAP ABAP Data Element CK_EINZELS (Ignore Product Cost Estimate Without Quantity Structure)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element | CK_EINZELS |
Short Description | Ignore Product Cost Estimate Without Quantity Structure |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Ignore |
Medium | 20 | Ignore PCE w/o QtyS |
Long | 40 | Ignore Prod Cost Est w/o Qty Structure |
Heading | 50 | Ignore Product Cost Estimate Without Qty Structure |
Documentation
Definition
Determines whether a cost estimate with quantity structure can access data that was produced by a cost estimate without quantity structure.
Use
You set this indicator if you do not want to work with a cost estimate without quantity structure.
- If this indicator is set, the system will ignore data produced by a cost estimate without quantity structure when selecting the BOM as well as when costing. Instead, the system will attempt to calculate the costs of manufacturing the material using an existing BOM or an existing operation.
In the costing view of the material master record, you can use the With quantity structure indicator to specify that the material should be costed either with or without a quantity structure. If the Ignore cost estimate w/o qty structure indicator in the costing variant is set, the system will ignore the entry in the material master record.
- If neither this indicator is set nor the With quantity structure indicator in the costing view of the material master record, the system will search for valid cost estimates without quantity structure to valuate the material components listed in the quantity structure of the cost estimate.
In sales order costing, this switch is effective only in connection with transfer control according to the principle described above.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |