SAP ABAP Data Element CK_BIDAT (Costing Date To)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element | CK_BIDAT |
Short Description | Costing Date To |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CK_KADAT | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | KDB | |
Default Component name | VALID_TO | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 5 | to |
Medium | 15 | Costing Date To |
Long | 21 | Costing Date To |
Heading | 10 | Valid to |
Documentation
Definition
Date to which the cost estimate is valid.
Use
This date is used for the following purposes:
- Material cost estimates and Easy Cost Planning
This date determines the date up to which the cost estimate is valid.
- Additive cost estimates
This date determines the date up to which the cost estimate is valid.
For the results of an additive cost estimate to be added to a cost estimate with quantity structure, the validity of the additive cost estimate must correspond to that of the cost estimate with quantity structure.
- Variance calculation
Variance calculation requires a standard cost estimate that is valid for the entire fiscal year.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |