SAP ABAP Data Element CK_AVANZ (Number of Objects for Next Step in Costing Run (Worklist))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CK (Package) R/3 Application development: PP Product Costing
⤷
⤷
⤷
Basic Data
| Data Element | CK_AVANZ |
| Short Description | Number of Objects for Next Step in Costing Run (Worklist) |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CK_INT4 | |
| Data Type | INT4 | 4-byte integer, integer number with sign |
| Length | 10 | |
| Decimal Places | 0 | |
| Output Length | 10 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 5 | WL |
| Medium | 10 | Worklist |
| Long | 25 | Worklist for Next Step |
| Heading | 55 | Worklist for Next Step in Costing Run |
Documentation
Definition
Number of objects that can be processed in the next step of the costing run.
- After the selection/BOM explosion step, this number equals the number of objects (materials, procurement alternatives) that were selected successfully and which, therefore, can be costed.
- Following costing, the number equals the amount of successfully-executed material cost estimates that can be marked and released. Examples of cost estimates that are not included are those for procurement alternatives, valuation types, or configured materials.
History
| Last changed by/on | SAP | 19990520 |
| SAP Release Created in |