SAP ABAP Data Element CK_AVANZ (Number of Objects for Next Step in Costing Run (Worklist))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element | CK_AVANZ |
Short Description | Number of Objects for Next Step in Costing Run (Worklist) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CK_INT4 | |
Data Type | INT4 | 4-byte integer, integer number with sign |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 5 | WL |
Medium | 10 | Worklist |
Long | 25 | Worklist for Next Step |
Heading | 55 | Worklist for Next Step in Costing Run |
Documentation
Definition
Number of objects that can be processed in the next step of the costing run.
- After the selection/BOM explosion step, this number equals the number of objects (materials, procurement alternatives) that were selected successfully and which, therefore, can be costed.
- Following costing, the number equals the amount of successfully-executed material cost estimates that can be marked and released. Examples of cost estimates that are not included are those for procurement alternatives, valuation types, or configured materials.
History
Last changed by/on | SAP | 19990520 |
SAP Release Created in |