SAP ABAP Data Element CK_AVANZ (Number of Objects for Next Step in Costing Run (Worklist))
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element CK_AVANZ
Short Description Number of Objects for Next Step in Costing Run (Worklist)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CK_INT4    
Data Type INT4   4-byte integer, integer number with sign 
Length 10    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short WL 
Medium 10 Worklist 
Long 25 Worklist for Next Step 
Heading 55 Worklist for Next Step in Costing Run 
Documentation

Definition

Number of objects that can be processed in the next step of the costing run.

  • After the selection/BOM explosion step, this number equals the number of objects (materials, procurement alternatives) that were selected successfully and which, therefore, can be costed.
  • Following costing, the number equals the amount of successfully-executed material cost estimates that can be marked and released. Examples of cost estimates that are not included are those for procurement alternatives, valuation types, or configured materials.

History
Last changed by/on SAP  19990520 
SAP Release Created in