SAP ABAP Data Element CCIHE_MPLDURATION (Planned Measurement Duration)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
EHS-IHS (Application Component) Industrial Hygiene and Safety
⤷
CBIH (Package) EH&S: Industrial Hygiene and Safety

⤷

⤷

Basic Data
Data Element | CCIHE_MPLDURATION |
Short Description | Planned Measurement Duration |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CCIHD_MDURATION | |
Data Type | TIMS | Time field (hhmmss), stored as char(6) |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 8 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plan Dur. |
Medium | 13 | Planned Dur. |
Long | 20 | Planned Meas. Dur. |
Heading | 13 | Planned Dur. |
Documentation
Definition
Specifies for how long a measurement is to be performed.
Dependencies
The system displays the standard value set in Customizing for the measurement method. You can change the value as long as the measurement has the status "Created."
History
Last changed by/on | SAP | 20030326 |
SAP Release Created in |