Data Element | CALL_STATUS |
Short Description | Description of Scheduling Type and Call Status |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR45 | |
Data Type | CHAR | Character String |
Length | 45 | |
Decimal Places | 0 | |
Output Length | 45 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | CallStatus |
Medium | 15 | Call Status |
Long | 20 | Call Status |
Heading | 15 | Call Status |
Documentation
Definition
Specifies under which scheduling type the maintenance call is found and the current status of that call.
The following statuses are possible:
- Called
The system has generated a maintenance call object (for example, maintenance order) for the call.
- Save to call
A maintenance call object is generated as soon as you save the maintenance plan.
- Blocked
All call dates which the system has generated for this maintenance plan are blocked. The system will not generate any maintenance call objects for the dates in this maintenance plan until the calls are unblocked by a status change.
- Confirmed
The maintenance call has been confirmed.
- Skipped
The maintenance call has been skipped. No maintenance call object is generated for this call.
- On hold
The system only generates a maintenance call object on the call date. Until this date, the call has the status "On hold".
- Completed
If all the maintenance call objects for a planned date have been confirmed, the maintenance call obtains the status 'Completed'. This means that for this status, the following are the decisive factors: For orders - the technical completion, for notifications - the completion, for service entry sheets - the acceptance. If you confirm manually in the maintenance plan, the system sets this status irrespective of the status of the call object.