SAP ABAP Data Element CACSSETTLDAT_C (Indicator for Determination of Current Settlement Period)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
ICM (Application Component) Incentive and Commission Management (ICM)
⤷
CACSPY (Package) ICM: Distribution & Offsetting

⤷

⤷

Basic Data
Data Element | CACSSETTLDAT_C |
Short Description | Indicator for Determination of Current Settlement Period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHOICE | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Period |
Medium | 15 | Curr.period |
Long | 20 | Curr.period |
Heading | 12 | Curr.period |
Documentation
Definition
Specifies how to process the period in settlement runs, in which the key date for settlement runs lies (=current period).
Use
You can select the type of processing for this period, as it cannot be indicated as being settled:
- The current period can be completely analyzed, meaning that all documents for this period are selected.
- The current period can be analyzed during the period, meaning that all documents until the key date are selected.
- The current period cannot be settled, meaning that the period is not analyzed.
An exception is if the key date is the same as the period-end date. In this case, it is possible to indicate the period as being settled because it can be regarded as complete.
History
Last changed by/on | SAP | 20020219 |
SAP Release Created in | 463 |