SAP ABAP Data Element CACSSESCHNG (Settlement Schedule: Existing Schedule is Changeable)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ ICM (Application Component) Incentive and Commission Management (ICM)
⤷ CACSS5 (Package) ICM Settlement Scheduling: Database Tables
⤷ ICM (Application Component) Incentive and Commission Management (ICM)
⤷ CACSS5 (Package) ICM Settlement Scheduling: Database Tables
Basic Data
Data Element | CACSSESCHNG |
Short Description | Settlement Schedule: Existing Schedule is Changeable |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BOOLEAN_FLG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Changeable |
Medium | 16 | ExistSttSchedChn |
Long | 40 | Existing Settlement Schedule Changeable |
Heading | 40 | Existing Settlement Schedule Changeable |
Documentation
Definition
Changeability of an existing settlement schedule.
Use
The indicator is a characteristic of the scheduling rule.
Dependencies
An existing settlement schedule can be changed only if allowed by the version of the corresponding scheduling rule.
Example
The system changes a settlement schedule in the settlement scheduling, only if the corresponding version of the scheduling rule has the indicator Existing Settlement Schedule is Changeable. If this is not the case, a settlement schedule is left unchanged even if the remuneration needs to be rescheduled according to new information.
History
Last changed by/on | SAP | 20040210 |
SAP Release Created in | 500 |