SAP ABAP Data Element CACSFFLOVR (Override Actual Commission)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ ICM (Application Component) Incentive and Commission Management (ICM)
⤷ CACSS5 (Package) ICM Settlement Scheduling: Database Tables
⤷ ICM (Application Component) Incentive and Commission Management (ICM)
⤷ CACSS5 (Package) ICM Settlement Scheduling: Database Tables
Basic Data
Data Element | CACSFFLOVR |
Short Description | Override Actual Commission |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CACSFFLOVR | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | IgnActComm |
Medium | 20 | Ignore Actual Comm. |
Long | 24 | Ignore Actual Commission |
Heading | 24 | Ignore Actual Commission |
Documentation
Definition
Means that the request for calculating the actual commission for the affected settlement schedule item is overridden.
Use
If the field takes one of the fixed values 1, 2 or 3, then the request for actual calculation for the affected settlement schedule item is overridden. The settlement schedule run treats this type of settlement schedule item as a released item.
Example
Recall items in the liability scenario.
History
Last changed by/on | SAP | 20040315 |
SAP Release Created in | 500 |