SAP ABAP Data Element CACS_TECHTIME_B (Technically Valid From)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ ICM (Application Component) Incentive and Commission Management (ICM)
⤷ CACSVERS (Package) ICM: Versioning
⤷ ICM (Application Component) Incentive and Commission Management (ICM)
⤷ CACSVERS (Package) ICM: Versioning
Basic Data
Data Element | CACS_TECHTIME_B |
Short Description | Technically Valid From |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CACSTIMESTAMP | |
Data Type | NUMC | Character string with only digits |
Length | 14 | |
Decimal Places | 0 | |
Output Length | 19 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | TechnValFm |
Medium | 15 | Tech. Valid Fr. |
Long | 20 | Technic. Valid From |
Heading | 18 | Techn. Valid From |
Documentation
Definition
Definition
One of the criteria in the contract history for the commission system. Both must be filled - the effective and the technical validity - so that a contract version for the current event can be used as the basis for settlement.
Use
Documents the exact processing event for a change. This does not have to be identical to the event for which the change is effective.
Technical information
The technical validity always refers to the system clock on the database server (timestamp format: YYYY.MM.DD hh:mm:ss). It is checked against the actual evaluation date, which can only deviate from the current time for subsequent checks.
History
Last changed by/on | SAP | 20020219 |
SAP Release Created in |