SAP ABAP Data Element CACS_SESAGR_ID_SC (Number of Settlement Scheduling Agreement)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   ICM (Application Component) Incentive and Commission Management (ICM)
     CACS2D (Package) ICM: DDIC for ICM Basis Framework
Basic Data
Data Element CACS_SESAGR_ID_SC
Short Description Number of Settlement Scheduling Agreement  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR12    
Data Type CHAR   Character String 
Length 12    
Decimal Places 0    
Output Length 12    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short NoSchA 
Medium 11 No.SchedAgr 
Long 38 Number of Scheduling Agreement 
Heading 38 Number of Scheduling Agreement 
Documentation

Definition

Unique identification number of a settlement schedule agreement in a commission contract.

Use

You use the settlement schedule agreement to assign scheduling rules to a commission contract. You can only assign rules that are already assigned to the corresponding standard commission contract.

Dependencies

Once the scheduling rules have been determined in the commission case process, the rules found are compared with those agreed upon in the commission contract. If none of the scheduling rules found has been contractually agreed upon, then the system does not schedule settlement despite valid search results. If the commission contract enables you to use more than one of the scheduling rules that have been found, then the rule with the highest priority is chosen.

History
Last changed by/on SAP  20040223 
SAP Release Created in 500