SAP ABAP Data Element BUSTVALU (Calculate Value Date)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ FREP (Package) RF reporting
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ FREP (Package) RF reporting
Basic Data
Data Element | BUSTVALU |
Short Description | Calculate Value Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Value date |
Medium | 19 | Calculate value dte |
Long | 21 | Calculate value date |
Heading | 0 |
Documentation
Definition
If you activate the parameter "Calculate value date" the following method is used to calculate the average value date:
Using a time interval from day A to day B entered in the program, the value date is calculated by taking the:
- Difference betweeen B and X (in days) for all documents and their line items per tax code and multiplying this difference by the corresponding tax amount. The resulting amounts are totalled and then divided by the total tax amounts for all documents;
- The resulting figure represents the weighted number of days relative to day B;
- The absolute value date is then calculated from day B minus the weighted number of days;
Note the following special cases:
- If program selections are limited using posting periods, the upper and lower level of the time interval is automatically calculated by the program;
- If X is smaller than A, X is replaced by (A - 1) (A minus one day)
- If X is greater than or equal to B, X is replaced by B.
History
Last changed by/on | SAP | 19971020 |
SAP Release Created in |