SAP ABAP Data Element BSPERIOD_FRQ_UNLINK (Flexible Period)
Hierarchy
☛
SAP_BS_FND (Software Component) SAP Business Suite Foundation
⤷ CA-EPT (Application Component) Processes and Tools for Enterprise Applications
⤷ BS_PERIOD_API (Package) API for period toolset
⤷ CA-EPT (Application Component) Processes and Tools for Enterprise Applications
⤷ BS_PERIOD_API (Package) API for period toolset
Basic Data
Data Element | BSPERIOD_FRQ_UNLINK |
Short Description | Flexible Period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | FLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Flexible |
Medium | 20 | Flexible Period |
Long | 40 | Flexible Period |
Heading | 55 | Flexible Period |
Documentation
Definition
Use
If you set a frequency type as flexible, the generated periods will not necessarily be aligned with the calendar. Then the start date of the first period in the list is defined by the selection range begin date.
Please do not set this checkbox if you expect your periods to be aligned with the calendar (weeks = calendar weeks).
Dependencies
Example
If you set the frequency type Weekly as flexible, the period could begin on a Wednesday and end on a Tuesday. The start day of the period or period list depends on the selection range.
If you want to see all weeks between 10/21/2012 and 12/31/2012, the weeks generated will start on a Wednesday and end on a Tuesday.
History
Last changed by/on | SAP | 20130604 |
SAP Release Created in | 702 |