Hierarchy
⤷
⤷
Basic Data
| Data Element | BP_YR_END |
| Short Description | Last year for processing |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | GJAHR | |
| Data Type | NUMC | Character string with only digits |
| Length | 4 | |
| Decimal Places | 0 | |
| Output Length | 4 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | to |
| Medium | 15 | To |
| Long | 20 | to |
| Heading | 4 | to |
Documentation
Definition
Year, to which plan/budget values are totaled up. In the standard, the year up to which planning/budgeting is possible is entered in this field.
This is defined in the budget/plan profile in the application configuration menue.
Examples
The time horizon in the plan/budget profile is as follows:
- past: 2
- future: 4
- start: 1
The reference value for the start year is the current fiscal year (e.g. 1995). Starting with the start year, the system calculates the time horizon:
Current fiscal year + start = start year
1995 + 1 = 1996
Start year - past = past time horizon
1996 - 2 = 1994
Start year + future = future time horizon
1996 + 4 = 2000
You can plan/budget for the years 1994 - 2000.
The default entry in the field is 2000.
If you want to total up the values for one year, enter the same year in the "from" and "to" fields.
History
| Last changed by/on | SAP | 20010720 |
| SAP Release Created in |