SAP ABAP Data Element BP_BPROFIL (Budget Profile)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CA-GTF-BS (Application Component) Business Application Support
⤷
KABP (Package) Cost Accounting budget and planning
⤷
⤷
Basic Data
| Data Element | BP_BPROFIL |
| Short Description | Budget Profile |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | BP_PROFIL | |
| Data Type | CHAR | Character String |
| Length | 6 | |
| Decimal Places | 0 | |
| Output Length | 6 | |
| Value Table | TBP1C |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | BP1 | |
| Default Component name | BUDGET_PROFILE | |
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Profile |
| Medium | 15 | Budget Profile |
| Long | 20 | Budget Profile |
| Heading | 20 | Budget Profile |
Documentation
Definition
The budget profile brings together the control parameters for budgeting.
Note: You should not maintain the budget profile if you use the Budget Control System (BCS).
Use
You can control budgeting with the following parameters:
- Time horizon
- Period into the past for which budgeting is possible
- Period into the future for which budgeting is possible
- Budgeting start year
- Budgeting of total/annual values
- Format
- What value is displayed as well as the budget, when you access the function
- Decimal places and scaling factor as default values
- Availability control (Project System, Funds Management)
- Of annual/total budget
- Of releases
- Currency translation
- Exchange rate type
- Value date
Dependencies
This description applies only in part for budget profiles in Cost Center Accounting (see the corresponding documentation on the detailed screen for Cost Center Accounting).
History
| Last changed by/on | SAP | 19981210 |
| SAP Release Created in |