SAP ABAP Data Element BP_BPROFIL (Budget Profile)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CA-GTF-BS (Application Component) Business Application Support
     KABP (Package) Cost Accounting budget and planning
Basic Data
Data Element BP_BPROFIL
Short Description Budget Profile  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type BP_PROFIL    
Data Type CHAR   Character String 
Length 6    
Decimal Places 0    
Output Length 6    
Value Table TBP1C    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID BP1  
Default Component name BUDGET_PROFILE   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Profile 
Medium 15 Budget Profile 
Long 20 Budget Profile 
Heading 20 Budget Profile 
Documentation

Definition

The budget profile brings together the control parameters for budgeting.

Note: You should not maintain the budget profile if you use the Budget Control System (BCS).

Use

You can control budgeting with the following parameters:

  • Time horizon
    • Period into the past for which budgeting is possible
    • Period into the future for which budgeting is possible
    • Budgeting start year
    • Budgeting of total/annual values
  • Format
    • What value is displayed as well as the budget, when you access the function
    • Decimal places and scaling factor as default values
  • Availability control (Project System, Funds Management)
    • Of annual/total budget
    • Of releases
  • Currency translation
    • Exchange rate type
    • Value date

Dependencies

This description applies only in part for budget profiles in Cost Center Accounting (see the corresponding documentation on the detailed screen for Cost Center Accounting).

History
Last changed by/on SAP  19981210 
SAP Release Created in