SAP ABAP Data Element BP_AVA_ALL (Availability control against overall value)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CA-GTF-BS (Application Component) Business Application Support
     KABP (Package) Cost Accounting budget and planning
Basic Data
Data Element BP_AVA_ALL
Short Description Availability control against overall value  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type X    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Overall 
Medium 15 Overall 
Long 20 Avail. ctrl: overall 
Heading  
Documentation

Definition

Indicator which controls whether availability checks are conducted against the overall value or against annual ones.

Supplementary Documentation - BP_AVA_ALL0001

Use

In the project budget profile, the "Overall" indicator, used in conjunction with the "Releases" indicator, has the following effect:

Ind. 'Overall'    Ind. 'Releases'    Avail. control against ...

X    -    Overall budget

-    -    Annual budget

X    X    Overall budget released

-    X    Annual budget released

X = Indicator is set, in other words, checkbox was checked.

Procedure

Examples

Dependencies

If you carry out budgeting and then change the availability control settings, you should have the system recalculate the assigned values.

To do this, start availability control background activation in your application and choose the indicator "Recalculate all funds commitments".

Supplementary Documentation - BP_AVA_ALL0002

Use

If the indicator is set, availability control conducts checks against the overall budget.

Procedure

Examples

Dependencies

History
Last changed by/on SAP  20010720 
SAP Release Created in