SAP ABAP Data Element BP_AKT_ART (Availability control activation type)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CA-GTF-BS (Application Component) Business Application Support
     KABP (Package) Cost Accounting budget and planning
Basic Data
Data Element BP_AKT_ART
Short Description Availability control activation type  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type BP_AKT_ART    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Actvn type 
Medium 15 Activation Type 
Long 33 Availability control actvtn type 
Heading
Documentation

Definition

Indicator which determines whether and how availability control should be activated.

There are three possibilities:

  • 0 = Cannot be activated

    Availability control cannot be activated - that is, active availability control is not possible for orders/projects with this budget profile.

    Caution:
    If you enter this setting, availability control which is already active may be deactivated again.

  • 1 = Automatic activation during budget allocation

    Availability control is automatically activated during budgeting - that is, it is activated as soon as you enter a budget for the project or order.
    Note:
    Budgeting is only possible if you have defined at least one tolerance limit for the budget profile.

  • 2 = Background activation when usage exceeded

    You can only activate availability control with the background activation function. The system activates availability control automatically for all projects/orders in which the funds commitments exceed the usage figure entered in the budget profile. To this end, you must enter:

    • the quantity of projects/orders for which availability control should be activated using background activation
    • the periodicity of the background job which activates availability control

      For detailed information, read the "Availability control" section of the Project System document.
      Note:

      You must also maintain tolerance limits for the budget profile, so that the system can check the postings.

History
Last changed by/on SAP  20010720 
SAP Release Created in