SAP ABAP Data Element BI_VB_AU (Split According to Creation and Usage)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     KKAG (Package) Period costing individual case
Basic Data
Data Element BI_VB_AU
Short Description Split According to Creation and Usage  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KKA_YES_NO    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Crtn/Usage 
Medium 15 Creation/Usage 
Long 20 Split creation/usage 
Heading CU 
Documentation

Definition

If this indicator is turned on, the inventory and reserves calculated by the WIP calculation or results analysis process are written under different cost elements depending on whether the inventories (such as the work in process, the value of the sales order stock, or the value of the project stock) and the reserves (such as the reserves for unrealized costs) were created or used.

Use

You turn on this indicator in the following situations:

  • When you want creation and usage to remain visible within a given period
  • When you want reductions to be differentiated between cancellation and usage

Dependencies

If you turn on this indicator, note the following:

  • You must define both a cost element for creation and a cost element for usage. Each of these cost elements must be of cost element category 31 (results analysis for orders/projects).
  • A field will appear under Update for creation and another field for usage. Define the update for creation separately from the update for usage.
  • You can create a posting rule for creation and a separate posting rule for usage.

If you turn on this indicator, you still only have to have one technical results analysis cost element in the results analysis version.

History
Last changed by/on SAP  19971109 
SAP Release Created in