SAP ABAP Data Element BEKNZ_MASK (Debit/Credit Indicator Masked)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-CIC (Application Component) Interaction Center WinClient
⤷
KKAG (Package) Period costing individual case

⤷

⤷

Basic Data
Data Element | BEKNZ_MASK |
Short Description | Debit/Credit Indicator Masked |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BEKNZ_MASK | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Dr/Cr Ind. |
Medium | 15 | Debit/CreditInd |
Long | 20 | Debit/Credit Indic. |
Heading | 4 | D/CI |
Documentation
Definition
This indicates whether the costs that are written under the cost element entered are credits or debits for results analysis and WIP calculation.
Use
Postings made under the same cost element are separated for results analysis and WIP calculation using this indicator.
Procedure
Examples
The withdrawal of a semifinished product from stock and the delivery of the semifinished product to stock is written under the same primary cost element. This is controlled by material account determination.
In WIP calculation, the withdrawal is treated as a debit and the delivery is treated as a credit. The debit posting is assigned to a line ID of category "K" (costs) and the credit posting is assigned to a line ID of category "A" (settled costs).
Dependencies
History
Last changed by/on | SAP | 19950401 |
SAP Release Created in |