SAP ABAP Data Element BEARZ_VG (Processing time in days)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
VBAS (Package) Application development R/3 sales master data
⤷
⤷
⤷
Basic Data
| Data Element | BEARZ_VG |
| Short Description | Processing time in days |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | DEC3_2 | |
| Data Type | DEC | Counter or amount field with comma and sign |
| Length | 5 | |
| Decimal Places | 2 | |
| Output Length | 6 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Proc.time |
| Medium | 15 | Processing time |
| Long | 20 | Processing time |
| Heading | 6 | ProcTi |
Documentation
Definition
Specifies the processing time required to ship all the items in a sales document. The time is calculated in days.
Use
The system calculates the time required to handle each delivery item by adding together the following times in the Sales/Plant view of the material master record:
The setup time is independent of the quantities involved. It may take 1 day, for example, to prepare the loading area for shipping a particular material, regardless of quantity. You specify the processing time by base unit. It is the amount of time it takes to prepare a certain quantity of the material (for example, 1 hour per 50 pieces) for shipping.
History
| Last changed by/on | SAP | 19920610 |
| SAP Release Created in |