SAP ABAP Data Element AUTOAUFDT (Reschedule with production versions)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CY01 (Package) R/3 Application Development: Resource Planning
Basic Data
Data Element AUTOAUFDT
Short Description Reschedule with production versions  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KREUZ    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 AutoOrdLTS 
Medium 15 Resche.prod.ver 
Long 30 Reschedule with prod.version 
Heading  
Documentation

Use

Specifies that when an operation is rescheduled the production version is copied to the planned order in which the new work center is entered as the production line. The planned order is scheduled with the new routing and dispatched to the new production line. The condition for copying the new production version is that the old work center is a production line in a production version.

The conditions for this function are:

  • the old and the new work centers are specified in the production versions of the material as production lines.
  • the old and the new work centers in the routings of these production versions are not assigned to more than one operation.

If these prerequisites are not fulfilled then the system carries out scheduling using the formulas from the new work center but the old standard values and the operation is dispatched to the new work center.

Dependencies

This indicator is only relevant for planned orders.

If in addition to setting the indicator Reschedule with production version you set the indicator Terminate when resched.with prod.version rescheduling is terminated if one of the conditions above is not fulfilled.

History
Last changed by/on SAP  19980706 
SAP Release Created in