Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD (Package) Application development R/3 requirements planning
Basic Data
Data Element | ANZLS |
Short Description | Display material list |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Displ.list |
Medium | 15 | Display list |
Long | 40 | Display material list |
Heading | 10 | Displ.list |
Documentation
Definition
Instructs the system to create a list of the planned materials after the planning run.
Supplementary Documentation - ANZLS 0001
Use
You use the material list to check which materials were planned in the planning run. You can also goto the MRP list or the stock/requirements list directly from the material list.
To do this, you position the cursor on the material and select the pushbutton for the MRP list or for the stock/requirements list.
Procedure
Examples
Dependencies
In Customizing, you can make the following settings for the total planning run:
- You can define the degree of detail for the material list. For example, you can define that every fifth material is to be displayed in the list.
- You can define whether a material list is to be displayed per plant. If this is defined in Customizing, the system will display a material list even if the field in the initial screen was not selected.
Supplementary Documentation - ANZLS 0002
Use
This list can be accessed using the pushbutton, Materials.
In the material list, you can acccess and process the planning result for each material that was planned. Moreover, a list of search functions are available in the material list so that, for example, you can search for specific exceptions.
Procedure
Examples
Dependencies
Supplementary Documentation - ANZLS 0003
Use
By selecting this indicator, the system displays a list of the planned materials in the selected plant after the planning run (both online background).
This control parameter has priority over the entry in the initial screen of the online total planning run or in the variant of the background job.
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 19991209 |
SAP Release Created in |