Hierarchy
⤷ PE (Application Component) Training and Event Management
⤷ PP09 (Package) Training and Event Management
Basic Data
Data Element | AMUST |
Short Description | Time Schedule of Business Event |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | AMUST | |
Data Type | CHAR | Character String |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 8 | |
Value Table | T77AM |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | SCHEDULE_PATTERN | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 8 | Schedule |
Medium | 12 | Schedule |
Long | 20 | Time schedule |
Heading | 8 | Schedule |
Documentation
Definition
A schedule defines a time schedule for business events. It consists of a sequence of day schedules. Each day has a number (001, 002 etc.) and a time block ID (consisting of a maximum of three time blocks, each with a start and end time).
Procedure
Specify a schedule in one of the following ways:
- Click the possible entries button and select one from the list of schedules that is displayed, or
- enter the key of the schedule you require directly.
Supplementary Documentation - AMUST 1000
Use
Enter a user-definable day schedule name.
Supplementary Documentation - AMUST 4023
Use
This field contains the day schedule (from table T770B) relevant for the time-related reservation of resources. This is generally the day schedule set for the business event in infotype 1022 (Schedule). The business event can be said to reserve the resources with this day schedule.
When a new relationship is added, if the field contains the value from infotype 1022 appended to the business event, you should not change this value if possible. If you change the value, it could mean that the reservation of the resource would be different from that of the business event schedule. You should only change the schedule if you explicitly wish to have a different reservation. Otherwise, a change can lead to undesired multiple bookings of related resources by other business events.
History
Last changed by/on | SAP | 20040116 |
SAP Release Created in |