SAP ABAP Data Element ALPDBRTYP (Aggregation and Resolution of a CPH Data Record)
Hierarchy
☛
SAP_BASIS (Software Component) SAP Basis Component
⤷ BC-CCM-MON (Application Component) Monitoring
⤷ SMOI (Package) CCMS: Monitoring Architecture
⤷ BC-CCM-MON (Application Component) Monitoring
⤷ SMOI (Package) CCMS: Monitoring Architecture
Basic Data
Data Element | ALPDBRTYP |
Short Description | Aggregation and Resolution of a CPH Data Record |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR6 | |
Data Type | CHAR | Character String |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | RecordType |
Medium | 19 | Aggreg./Resoltn |
Long | 25 | Aggregation/Resolution |
Heading | 0 |
Documentation
Definition
All Central Performance History (CPH) data is characterized by its resolution and its aggregate.
- The resolution (minute, quarter-hour, hour, or day) specifies the proportion of a day over which the performance values are averaged.
- The aggregate (day, X days, week, month, quarter, or year) specifies the number of days over which the above fractions of a day are averaged.
Use
In the CPH, aggregation is primarily used to reduce the database's memory requirements. Collected performance values are only stored for a defined period of time in the CPH, before they are aggregated and the original data is deleted. Information loss is inevitably connected with each aggregation; without aggreation, however, the space requirement of the CPH would grow beyond all limits in the long term.
Dependencies
Example
A weekly aggregate with hourly resolution contains 24 hourly mean values, in each of which the values from an hour (such as 12:00 to 13:00) are aggregated from the 7 days of the week into one value.
History
Last changed by/on | SAP | 20040312 |
SAP Release Created in |