Hierarchy

⤷

⤷

Basic Data
Data Element | ADPM_TWTFLAG |
Short Description | CMC: Use Minimum or Standard TWT from PP Matrix |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | TWT S/M |
Medium | 15 | TWT Std/Min. |
Long | 22 | Use TWT Std/Minimum |
Heading | 22 | Use TWT Std/Minimum |
Documentation
Definition
Determines the type of move time that the CMC uses in the buffer calculation in accordance with the standard (S) and minimum (M) values defined in the move time matrix in Customizing for Production.
The CMC uses this information to distribute buffer. You can switch between the standard and minimum move times.
Procedure
- In the Implementation Guide, ensure that standard and minimum transport times between the affected work centers has been configured in the PP move time matrix.
- If you want to use standard transport times for the affected operation and work center, ensure that the value is set to S in the CMC.
- To speed up the MRO process, change the value to M for the affected operation and work center in the CMC.
Examples
An order may be created from different task lists: If several work centers are involved the transport time between these work centers has to be taken into account. Transport time is normally not part of the task list.
In Customizing for the PP move time matrix you determine a minimum and a standard move time between work centers.
You define that the standard move time from work center A to B and from B to A is 2 hours. The minimum move time both ways is set to 30 minutes. The transport matrix also allows you to define asymmetric transport times, i.e. from A to B 2 hours, but from B to A 3 hours.
Dependencies
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in |