SAP ABAP Data Element ADPM_EXCNF (CMC: Expected Confirmation Interval)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-AD (Application Component) Aerospace & Defence Industry Solution
⤷ AD_ROT_PRIO (Package) A&D : Rotable Control ( CMC )
⤷ IS-AD (Application Component) Aerospace & Defence Industry Solution
⤷ AD_ROT_PRIO (Package) A&D : Rotable Control ( CMC )
Basic Data
Data Element | ADPM_EXCNF |
Short Description | CMC: Expected Confirmation Interval |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DEC3_2 | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 5 | |
Decimal Places | 2 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Exp.Cnf. |
Medium | 18 | Exp.Conf.Interval |
Long | 30 | Expected Confirmation Interval |
Heading | 30 | Expected Confirmation Interval |
Documentation
Definition
Determines the period as a relative percentage of the operation in which a partial confirmation is expected.
This affects the warning symbols that are set for the operation, and the missing confirmation indicator.
This is not recommended for operations that are short duration. To restrict the operations to which this function should apply you can define a minimum order and operation duration in fields Min.Opr.Dur. and Min.Ord.Dur.
Procedure
Examples
If you enter the relative percentage 20 the CMC expects a partial confirmation when 20%, 40%, 60% and 80% of the operation is complete and a final confirmation when 100% is complete.
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in |