SAP ABAP Data Element ABSPWN (Currency of arrangement in case of conversion (Euro))
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       WBON (Package) WWS: Bonus
Basic Data
Data Element ABSPWN
Short Description Currency of arrangement in case of conversion (Euro)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WAERS    
Data Type CUKY   Currency key, referenced by CURR fields 
Length 5    
Decimal Places 0    
Output Length 5    
Value Table TCURC    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Arr. curr. 
Medium 15 Arr. currency 
Long 20 Rebate arr. currency 
Heading 10 Arr. curr. 
Documentation

Definition

New currency for the rebate arrangement in the case of a change in arrangement currency.

Use

You can change the arrangement currency of a rebate_arrangement (European Monetary Union).

The settled rebate income is shown in the new currency from the time of conversion onwards. Internally, however, the program uses the old arrangement currency when updating the cumulative rebate income and vendor business volumes in the Logistics Information System.

For this reason, you should only convert to currencies with a fixed exchange rate (Euro), otherwise you must reckon with currency translation variances at the time of settlement accounting.

The basis for the updating of the cumulative figures is not changed to the new rebate arrangement currency until the arrangement is extended (manually or via report) or the function "Create using the referencing technique" is used.

History
Last changed by/on SAP  19980218 
SAP Release Created in