Hierarchy
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKAG (Package) Period costing individual case
Basic Data
Data Element | ABSCHL_PER |
Short Description | Cutoff Period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KKANUM7 | |
Data Type | NUMC | Character string with only digits |
Length | 7 | |
Decimal Places | 0 | |
Output Length | 7 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Cutoff |
Medium | 15 | Cutoff Period |
Long | 35 | Cutoff Period for Actual RA/WIP |
Heading | 7 | Cutoff |
Documentation
Definition
Period that divides the life cycle of an object for which WIP calculation or results analysis is to be performed into open and closed periods.
Use
The cutoff period prevents the results analysis data calculated during the results analysis or WIP calculation process (such as work in process or reserves for unrealized costs) from being overwritten by the next results analysis or WIP calculation process.
The data calculated up to and including the cutoff period is not changed by the current results analysis or WIP calculation process.
The results analysis data calculated in later periods is overwritten by the current results analysis or WIP calculation process.
Dependencies
This means that the results analysis data from earlier periods, for which postings may have been generated in Financial Accounting, is not changed. Changes to the plan data or actual data in earlier periods are accounted for by the results analysis or WIP calculation process in the first open period.
History
Last changed by/on | SAP | 19990326 |
SAP Release Created in |