SAP ABAP Data Element ABGRWIP_O (Work in Process in Object Currency)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
Basic Data
Data Element | ABGRWIP_O |
Short Description | Work in Process in Object Currency |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | WIP |
Medium | 15 | Work in process |
Long | 20 | Work in process OC |
Heading | 3 | WIP |
Documentation
Definition
Value of the work in process, shown in object currency or company code currency.
Prerequisites
You must first perform work-in-process calculation for your manufacturing orders in the period-end closing function in Cost Object Controlling.
History
Last changed by/on | SAP | 19980514 |
SAP Release Created in |