SAP ABAP Data Element ABGRWIP (Work in Process)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
Basic Data
Data Element | ABGRWIP |
Short Description | Work in Process |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | WIP |
Medium | 15 | Work in process |
Long | 20 | Work in process |
Heading | 21 | WIP |
Documentation
Definition
Value of the work in process.
Use
This is the difference between the actual cost debit and the actual cost credit of an order if the debits exceed the credits and the order has not been delivered or technically completed.
You can transfer the work in process to Financial Accounting and Profit Center Accounting (EC-PCA) when you settle the order.
Prerequisites
You must first calculate the work in process in period-end closing of Cost Object Controlling.
History
Last changed by/on | SAP | 20000119 |
SAP Release Created in |