SAP ABAP Data Element ABGRWIP (Work in Process)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-IS (Application Component) Product Cost Controlling Information System
     KKB (Package) Reporting for Costing
Basic Data
Data Element ABGRWIP
Short Description Work in Process  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV8    
Data Type CURR   Currency field, stored as DEC 
Length 15    
Decimal Places 2    
Output Length 21    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 WIP 
Medium 15 Work in process 
Long 20 Work in process 
Heading 21 WIP 
Documentation

Definition

Value of the work in process.

Use

This is the difference between the actual cost debit and the actual cost credit of an order if the debits exceed the credits and the order has not been delivered or technically completed.

You can transfer the work in process to Financial Accounting and Profit Center Accounting (EC-PCA) when you settle the order.

Prerequisites

You must first calculate the work in process in period-end closing of Cost Object Controlling.

History
Last changed by/on SAP  20000119 
SAP Release Created in