SAP ABAP Data Element ABGBESGES (Total WIP)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
Basic Data
Data Element | ABGBESGES |
Short Description | Total WIP |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | WIP |
Medium | 15 | Total WIP |
Long | 20 | Total WIP |
Heading | 15 | Total WIP |
Documentation
Definition
Total of the key figures calculated in results analysis (capitalized costs, revenue in excess of billings) or in the calculation of work in process (work in process).
The total WIP is calculated in the following formula:
Capitalized costs / work in process
+ Revenue in excess of billings
-------------------------------------------
= Total WIP
Dependencies
These key figures are calculated in dependency on the valuation method chosen for results analysis or for the calculation of work in process.
Further Information
For detailed information on the data calculated in results analysis, refer to the documentation Product Cost by Sales Order under Period-End Closing -> Results Analysis.
History
Last changed by/on | SAP | 19980617 |
SAP Release Created in |