Hierarchy
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ /SAPCEM/DDIC (Package) CEM Dictionary Objects
Basic Data
Data Element | /SAPCEM/DAUER |
Short Description | Retention Period of CEM Objects in BAL (Days) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC4 | |
Data Type | NUMC | Character string with only digits |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Ret. per. |
Medium | 15 | Retention per. |
Long | 20 | Retn per. in BAL |
Heading | 12 | Retention |
Documentation
Definition
Entries in this table define how many days (minimum) CEM settlement logs are stored in the application log. In other words, logs of the appropriate type cannot be deleted from the system before this period has elapsed (deletion using transaction SLG2).
CEM SD settlement logs belong to object /SAPCEM/SD
Assignment of sub-objects:
SD_AB Update run
SD_NA Postprocessing run
SD_SO Test run with generation of SD order without
status update
(only with special authorization in test system)
SD_TE Test run
SD_JOB External job
The following retention periods are recommended:
SD_AB 500 days
SD_NA 500 days
_SD_SO 500 days
SD_TO 50 days
Note:
The logs are not automatically deleted from the system. You have to delete them explicitly using transaction SLG2.
You can find the logs in the CEM menu under Settlement or by entering transaction /SAPCEM/SD_PROT.
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in | 46C2 |