SAP ABAP Domain STRUKTURPL (Strategy for Breakdown Structure Values)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKAG (Package) Period costing individual case
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKAG (Package) Period costing individual case
Basic Data
Domain Name | STRUKTURPL |
Short Description | Strategy for Breakdown Structure Values |
Definition
Data Type | CHAR | Character String |
No. Characters | 1 | |
Decimal Places | ||
Output Length | 1 | |
Conversion Routine | ||
Sign | ||
Lower Case |
Value Range
# | Lower Limit | Upper Limit | Short Description |
---|---|---|---|
1 | A | Overall Planning if Available, Otherwise Annual Value | |
2 | B | Overall Planning | |
3 | C | Annual Value Planning | |
4 | E | Annual Planning if Available, Otherwise Overall Planning | |
5 | F | Overall or Annual as with A, with Breakdown Structure Values | |
6 | G | Overall Planning, with Breakdown Structure Values | |
7 | H | Annual Value Planning, with Breakdown Structure Values | |
8 | J | Annual or Overall as with E, with Breakdown Structure Values | |
9 | K | Overall or Annual as with A, Costs and Revenues Separate | |
10 | L | Overall or Annual as with E, Costs and Revenues Separate | |
11 | M | Overall or Annual as with K, with Breakdown Structure Values | |
12 | N | Overall or Annual as with L, with Breakdown Structure Values | |
13 | O | Costs: Overall Planning, Revenue: Annual Value Planning | |
14 | P | Costs: Annual Value Planning, Revenue: Overall Planning | |
15 | Q | Overall and Annual Value Planning as with 0, with WBS Values | |
16 | R | Overall and Annual Value Planning as with P, with WBS Values | |
17 | Y | Overall and Annual Value Planning | |
18 | Z | Overall and Annual Planning, with Breakdown Structure Values | |
History
Last changed by/on | SAP | 20010221 |
SAP Release Created in |