SAP ABAP Domain DPR_CONTROLLING_METHOD_VORLAGE (Process Parameter Controlling Method for cProjects)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
CO (Application Component) Controlling
⤷
IAOM_CPROJECTS (Package) Cost and Revenue Controlling for cProjects
⤷
⤷
Basic Data
| Domain Name | DPR_CONTROLLING_METHOD_VORLAGE |
| Short Description | Process Parameter Controlling Method for cProjects |
Definition
| Data Type | CHAR | Character String |
| No. Characters | 1 | |
| Decimal Places | ||
| Output Length | 1 | |
| Conversion Routine | ||
| Sign | ||
| Lower Case |
Value Range
| # | Lower Limit | Upper Limit | Short Description |
|---|---|---|---|
| 1 | Internal Order (Project Definition, Automatic) | ||
| 2 | A | Multilevel Controlling (Structure Element, Manual) | |
| 3 | B | Multilevel Controlling (Project Role, Manual) | |
| 4 | C | Multilevel Controlling (Structure Element, Automatic) | |
| 5 | D | Multilevel Controlling (Project Role, Automatic) | |
| 6 | E | Multilevel Controlling (Comp.Code, Struc.Element, Automatic) | |
| 7 | F | Multilevel Controlling (Company Code, Proj. Role Automatic) | |
| 8 | G | Multilvl Contr.(CmpCode/PrCtr, Structure Element, Automatic) | |
| 9 | H | Multilevel Contr.(Comp.Code/PrCtr., Project Role, Automatic) | |
| 10 | I | Internal Order (Structure Element, Manual) | |
| 11 | J | Internal Order (Project Role, Manual) | |
History
| Last changed by/on | SAP | 20050519 |
| SAP Release Created in | 600 |