SAP ABAP IMG Activity V_INM_GEN_SET (Maintain Gen. Settings for Portf. and Proj. Mgmt Intgrn)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   PPM (Application Component) Portfolio and Project Management
     INM_CPPM (Package) Capital Project and Portfolio Management
IMG Activity
ID V_INM_GEN_SET Maintain Gen. Settings for Portf. and Proj. Mgmt Intgrn  
Transaction Code S_EE5_50000302   (empty) 
Created on 20091106    
Customizing Attributes V_INM_GEN_SET   Maintain Gen. Settings for Portf. and Proj. Mgmt Intgrn 
Customizing Activity V_INM_GEN_SET   Maintain Gen. Settings for Portf. and Proj. Mgmt Intgrn 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name V_INM_GEN_SET    

Use

In this Customizing activity, you can maintain the general settings that are used during integration between Portfolio and Project Management and Project System.

Requirements

Standard settings

Activities

You can choose the type of setting, and then enter information for the following fields:

  • RFC Destination - for the Portfolio and Project Management system.
  • Synchronization On - the status of the synchronisation.
  • Logon/Server Group - used for parallel processing.
  • Exchange Rate Type - used during currency conversion.
  • Data Packet (Parallel Processing)
  • The data packet figure refers to the number of Porfolio and Project Management items to be processed during parallel processing. Parallel processing is performed to fetch planning cost and capacity data associated with the Project System project.

The data packet figure is used to control the number of items that should be executed in each parallel step. When specifying this figure, consider the number of Project System projects or elements attached to Portfolio and Project Management items and system settings. The processing time of a parallel step should not exceed the processing time setting for the dialog step. (You can find this value by going to transaction RZ11 and entering the system profile parameter RDISP/MAX_WPRUN_TIME).

  • Data Packet (Data Transfer)
  • This data packet size refers to number of Project System projects for which planning costs and capacity associated with the Project System project will be fetched and transferred to the Portfolio and Project Management system. This figure is used to control the data size to be transferred to the Portfolio and Project Management system in one step. The amount of data that can be transferred to external system is limited by system memory.

Example

Business Attributes
ASAP Roadmap ID 105   Define functions and processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG V_INM_GEN_SET 0 L1B0000002 Portfolio and Project Management 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_INM_GEN_SET V - View SM30  
History
Last changed by/on SAP  20091117 
SAP Release Created in 605