ID | SIMG_V_TORS0 | Activate Time Dependency for System Status |
Transaction Code | S_ALR_87099881 | (empty) |
Created on | 19990325 | |
Customizing Attributes | SIMG_V_TORS0 | Activate Time Dependency for System Status |
Customizing Activity | SIMG_V_TORS0 | Activate Time Dependency for System Status |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_V_TORS0 |
In this IMG activity you can activate the system status evaluation by period. This impacts on:
- Results analysis for projects
- Project-related incoming orders
- Planned results analysis
You usually carry out these functions for a specific settlement period in the first days of the next period.
In order to process data for a certain period, the R/3 System must evaluate the status information of work breakdown structure elements as of the end of the settlement period.
Example
Requirements
Standard settings
The status evaluation by period is supported for the following statuses:
- Released
- Order accepted
- Fully billed
- Technically completed
Recommendation
Activities
If you activate status evaluation by period, the R/3 System records the date on which you changed the status in a table.
An exception is the Order accepted status. In this status, the system records the date the SD order was received instead of the date the status changed.
In status interpretation, the system verifies that the status change took place in the closing period.
You can overwrite the status change data manually online and, hence, backdate the change if required.
This means the system can also take account of changes to the status made after the period end.
Further notes
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_V_TORS0 | 0 | HLA0001584 | Results Analysis |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_TORS0 | V - View | SM30 |
History
Last changed by/on | SAP | 19990325 |
SAP Release Created in |