SAP ABAP IMG Activity SIMG_OLPR_OPSB (Maintain Planning Profiles)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CNPC (Package) R/3 Customizing PP Project Management
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CNPC (Package) R/3 Customizing PP Project Management
IMG Activity
ID | SIMG_OLPR_OPSB | Maintain Planning Profiles |
Transaction Code | S_ALR_87004643 | IMG Activity: SIMG_OLPR_OPSB |
Created on | 19981222 | |
Customizing Attributes | SIMG_OLPR_OPSB | Create/change plan profile |
Customizing Activity | SIMG_OLPR_OPSB | Create/Change Planning Profiles |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_OLPR_OPSB |
In this step, you:
- create new plan profiles
- change existing plan profiles
To be able to carry out project revenue planning, you must create a plan profile or use an existing one.
The following parameters are relevant to project cost planning:
- Time horizon
Here, you define the following:
- period into the past, from the start year, for which you can plan
- period into the future, from the start year, for which you can plan
- cost planning start year
- planning of overall and/or annual values
- Value representation
- standard view displayed as well as the planned value when you access the function
- decimal places and scaling factor as default values
- Planning in all WBS elements or only in planning elements
- Bottom-up planning within structure-oriented planning
The indicator determines whether planning is by the bottom-up procedures:
If you set the indicator, the system automatically totals up the cost values each time you save and check them. The higher-level WBS element receives the total plan values for the WBS elements beneath it as its structure plan value.
Prerequisites
You must first have processed the following menu items and parameters, so that they are available as default values:
- "Create cost element groups"
- revenues
- Revenue elements are cost elements defined with cost element type 11.
Action
- Use "Detail" to check the plan profiles delivered as standard in the SAP System.
- Change the details as necessary in the plan profiles, or create new ones as appropriate.
Additional information
You have the following alternative ways of assigning a plan profile to a project:
- as a default value in the Project System configuration menu
- in the project profile for a project definition (Operative structures)
- in the project profile for a standard project definition (Basic data)
- in the Project System application menu
- in the project definitioan control data, if you have not stored a plan profile in the project profile. (In the area menu, choose Operative structures -> Work breadown struc -> Change -> Detail -> Control -> Plan profile).
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_OLPR_OPSB | 0 | HLA0006822 | Planned Revenues |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_TBP1C_PP | V - View | OPSB | 01 | Create/Change Planning Profile |
History
Last changed by/on | SAP | 19990505 |
SAP Release Created in |