Hierarchy
⤷ PSM-GM-GTE (Application Component) Grantee Management
⤷ GMBASIS_E (Package) Grants management (basis)
IMG Activity
ID | SIMG_GM_AVC_SPECIAL | Define Special Assignments for Checking Horizon |
Transaction Code | S_ALN_01001469 | (empty) |
Created on | 20030212 | |
Customizing Attributes | SIMG_GM_AVC_SPECIAL | Define Special Assignments for Checking Horizon |
Customizing Activity | SIMG_GM_AVC_SPECIAL | Define Special Assignments for Checking Horizon |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_GM_AVC_SPECIAL |
Use
In this IMG activity you can define specific assignments for the checking horizon by implementing a derivation strategy. This specific assignment overwrites the default value of the checking horizon selected in the activity Assign Checking Horizon for Availability Control.
Notes
Each derivation strategy consists of a sequence of steps that uses one of the following step types:
- Initialization
In derivation steps of this type, you can set the value of any target field to initial blank.
- Assignment
In steps of this type, you can assign specific values to any target field. It is also possible to carry forward partial field contents of source fields to the target field.
- Derivation rule
In derivation rule steps, you can directly enter specific assignments of the checking horizon (for instance) to any combination of source fields.
- Table lookup
In a step of this step type, you can access individual records from database tables.
All derivation steps defined here can be linked to conditions, which must be met for the derivation step to be executed.
Example
You have selected the checking horizon Overall Period as default value for control ledger 9K in the activity Assign Checking Horizon for Availability Control. But for availability checks on control objects with certain values of the account assignment element Grant, you can overwrite this default value and use the checking horizon Annual period for checks with control ledger 9K.
Create a derivation step of step type Derivation rule, select Definition and choose as source field the field RGRANT_NBR and as target field the field CHECKHORIZON. Then select Condition and enter it as the condition for this derivation rule
Name of column Value
Field ALDNR
Op. =
Value 9K
After saving this new derivation step, maintain rule entries for all desired grant values.
Standard settings
SAP does not provide any standard implementation of the derivation strategy.
Activities
- Implement your derivation strategy.
- Save your strategy.
Further notes
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_GM_AVC_SPECIAL | 0 | ALN0000199 | Budgeting and Availability Control |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
GMAVCDERICH | T - Individual transaction object | GMAVCDERICH |
History
Last changed by/on | SAP | 20030522 |
SAP Release Created in | 200 |