Hierarchy

⤷

⤷

⤷

IMG Activity
ID | SIMG_CFMENUORKEKE4J | Assign Costing Keys to Material Types |
Transaction Code | S_ALR_87005761 | IMG Activity: SIMG_CFMENUORKEKE4J |
Created on | 19981222 | |
Customizing Attributes | SIMG_CFMENUORKEKE4J | Assign Costing Keys to Material Types |
Customizing Activity | SIMG_CFMENUORKEKE4J | Assign Costing Keys to Material Types |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_CFMENUORKEKE4J |
In this step, you assign costing keys to material types for each point of valuation, record type, and plan version (for plan data).
This assignment determines when and for which record type and plan version which product cost estimates are to be read for a specific material type.
You can assign up to three costing keys to each material type for a given "Valid to" date. This means that you can valuate the data using up to three different cost estimates at the same time. The system processes these cost estimates in the order in which the corresponding costing keys are entered on the screen.
Example
PV RecT Plan ver. Mat.type Valid to C.key 1 C.key 2 C.key 3
01 F MT01 31.12.2002 001 002
02 F MT01 31.12.2002 001
Further notes
In order to valuate CO-PA line items using material cost estimates in Product Cost Planning, you must define your valuation strategy so that the system accesses product costing for the desired point of valuation.
If you are valuating using more than one costing key, note that a value field can only be filled by valuation if it is empty. In other words, each value field can only be filled once, and is never overwritten.
The system follows certain rules for determining which costing keys to use:
- First it checks whether one or more costing keys has been assigned to the product being valuated. If so, it valuates the data using only those costing keys.
- If no costing key is assigned to the product, the system checks whether any costing keys have been assigned to the material type of the product. If so, the data is valuated only using those costing keys.
- If no costing keys have been assigned to the material type, the system then checks whether any costing keys have been assigned to other characteristics using the flexible assignment function. If no costing keys are found in this manner, the transaction cannot be valuated using a material cost estimate.
Likewise, no valuation is carried out if an entry exists in one of these assignment tables but does not contain a costing key.
Activities
Define which costing keys should be used for which material types. If you want to specify costing keys according to another characteristic instead of material types, proceed to the next step.
Business Attributes
ASAP Roadmap ID | 203 | Establish Master Data |
Mandatory / Optional | 1 | Mandatory activity |
Critical / Non-Critical | 1 | Critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_CFMENUORKEKE4J | 0 | HLA0100169 | Valuation |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_TKEVA03M | V - View | KE4J | 9999999999 | Call view maintenance |
History
Last changed by/on | SAP | 19990630 |
SAP Release Created in |