SAP ABAP IMG Activity SIMG_CFMENUOLSDVFBWG (Bulkiness and Minimum Weights)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       VIZ (Package) Introductory guide R/3 central functions
IMG Activity
ID SIMG_CFMENUOLSDVFBWG Bulkiness and Minimum Weights  
Transaction Code S_ALR_87006264   IMG Activity: SIMG_CFMENUOLSDVFBWG 
Created on 19981222    
Customizing Attributes SIMG_CFMENUOLSDVFBWG   Bulkiness and minimum weights 
Customizing Activity SIMG_CFMENUOLSDVFBWG   Bulkiness and minimum weights 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUOLSDVFBWG    

When you perform this IMG activity, you define bulkiness groups, bulkiness factors and minimum weights for shipping units.

Example

Bulkiness factor:

You have made the following agreement with your forwarding agent:

  • Shipment costs are calculated based on the weight to be shipped. The prices depend on a corresponding scaling.
  • For large-volume goods, you proceed as follows:
    • The volume (in litres) is divided by 6.
    • The resulting number is compared with the weight and the larger of the two numbers is set as the new weight.
    • The costs are then calculated based on this new weight.

Minimum weight:

You have made the following agreement with your forwarding agent:

  • Shipment costs are calculated based on the shipping units to be shipped (paletts or wire baskets, for example). For certain shipping units, the forwarding agent fixes a minimum weight.
  • For calculating the shipment costs, the actual weight of a shipping unit is compared with the corresponding minimum weight. The larger of the two numbers is used as the calculation basis.
  • Instead of a minimum weight, you can also define a minimum volume or a minimum length of loading platform.

Activities

  1. To define a bulkiness group:
    1. Choose "New entries".
    2. Enter a alphanumeric key with a maximum of six digits and a description.
    3. Save your entries.
  2. To assign bulkiness factors to a bulkiness group:
    1. Choose "New entries".
    2. Enter a reference scale basis to which the calculation refers (gross weight, for example).
    3. As the first unit of measure, enter a unit that complies with the reference scale basis (kilogram, for example).
    4. As the second unit of measure, enter a unit that complies with the comparison scale basis (litre, for example).
    5. Enter a bulkiness factor.
    6. Save your entries.
  3. To assign minimum weights to a bulkiness group:
    1. Choose "New entries".
    2. Enter a shipping material, for which you have defined a minimum weight (or volume or length of loading platform).
    3. Enter a minimum weight (or volume or length of loading platform) and a corresponding unit of measure.
    4. Save your entries.

Further notes

When the shipment costs are calculated, the system determines the bulkiness group using the condition technique of pricing. In the standard system, condition type "SP00" is available for this purpose. Create corresponding condition records.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUOLSDVFBWG 0 HLA0100740 Freight Processing 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
VVC_VFBWG_F1 C - View cluster SM34 00000001 Minimum weights and bulkiness factors 
History
Last changed by/on SAP  19981222 
SAP Release Created in