SAP ABAP IMG Activity SIMG_CFMENUOLPRUMFK3 (MS Project for downloading/uploading standard networks)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CNPC (Package) R/3 Customizing PP Project Management
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CNPC (Package) R/3 Customizing PP Project Management
IMG Activity
ID | SIMG_CFMENUOLPRUMFK3 | MS Project for downloading/uploading standard networks |
Transaction Code | S_ALR_87005597 | IMG Activity: SIMG_CFMENUOLPRUMFK3 |
Created on | 19981222 | |
Customizing Attributes | SIMG_CFMENUOLPRUMFK3 | MS Project for downloading/uploading standard networks |
Customizing Activity |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_CFMENUOLPRUMFK3 |
You can transfer standard networks from the Project System to MS Project (R) and networks from MS Project into standard networks.
To do this, proceed as follows:
Activities
- Install MS Project as described in its manual.
- Create a view with suitable export tables for resources and activities as described in the MS manual.
These tables must contain at least the following fields:
Resource table:
- 1: Description
- 2: SAP work center number
- 3: Plant
- 4: Capacity category
- 41: Maximum units
- 48: Calendar ID
Activity table:
MS:SAP
- 1: Description
- 3: Grouping level (alternative to 120)
- 11: SAP control key
- 12: SAP milestone description
- 13: SAP network number and SAP network alternative or SAP activity no.
- 40: Standard duration
- 70: Predecessor relationships
- 71: Successor relationships
- 81: Milestone indicator
- 120: Indicator: Composite activity (alternative to 3)
Recommendation
So that you do not have to make modifications to your own export tables for the upload and download, you should first work with the view file that can be obtained from SAP (the modified standard view). If you use it, you do not have to modify export tables.
Notes
You will find detailed information on the MS Project interface in the SAP Library under Interfaces to the Project System.
You need MS Project 3.0 or higher under Windows to work with your MS project.
Business Attributes
ASAP Roadmap ID | 203 | Establish Master Data |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_CFMENUOLPRUMFK3 | 0 | HLA0006672 | Standard Network |
Maintenance Objects
Maintenance object type |
History
Last changed by/on | SAP | 19981222 |
SAP Release Created in |