SAP ABAP IMG Activity PPPI_PO_360 (Define Production Scheduling Profiles)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CIIC (Package) CIM integration: Customizing
IMG Activity
ID PPPI_PO_360 Define Production Scheduling Profiles  
Transaction Code S_ALR_87007520   IMG Activity: PPPI_PO_360 
Created on 19981222    
Customizing Attributes PPPI_PO_360   Define Production Scheduling Profiles 
Customizing Activity PPPI_PO_360   Define Production Scheduling Profiles 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name PPPI_PO_360    

In this step, you can create production scheduling profiles for specific plants.

In a production scheduling profile, you can:

  • Specify that certain business transactions or processes are to be carried out in parallel in a production or process order
    • Order release at the time the order is opened
    • Generation of document link from the material master when the order is opened
    • Generation of document link from a BOM when the order is opened
    • Printing at the time of order release
    • Scheduling upon order release
    • Generation of document link from the material master upon order release
    • Generation of document link from a BOM upon order release
  • Specify whether only partial quantities are to be confirmed at the time of an availability check
  • Specify that an automatic goods receipt is to take place
  • Specify an overall profile for capacity leveling
  • Specify how the capacity requirements of the operations are to be taken into account in the basic load
  • Specify when capacity scheduling is to be carried out in the capacity availability check
  • Specify that in the case of the confirmation:
    • No short quantities are to be updated
    • No excess quantities are to be updated
    • Neither short nor excess quantities are to be updated
    • An adjustment of the operation and component quantities to the actual values is to take place
  • Make various specifications in the area of batch management:
    • Automatic batch creation when an order is opened
    • Branching to batch classification when a batch is changed
    • Extended batch classification via Customer Function Call
  • Specify that only transport requirements are to be created if transport requirements can be generated for all the components of the operation
  • Specify that either the committed quantities or the required quantities are to be taken into account when transport requirements are generated
  • Specify that the creation of transport requirements is to take place automatically
  • Specify which order type is to be suggested depending on the business process (make-to-stock, make-to-order, make for individual project, order without material)

You can assign a production scheduling profile to a:

  • Material (Work Scheduling screen in material master)
  • Production supervisor (Customizing)

The assignment to a material takes higher priority.

The production scheduling profile is adopted in the production or process order at the time the order is opened.

Activities

  1. Create the necessary production scheduling profiles.
  2. Assign the profiles to the appropriate materials or production supervisors.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG PPPI_PO_360 0 HLA0006252 Process Order 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_TCO43_40 V - View CORY 0000000000 Define Production Scheduling Profiles (PP-PI) 
History
Last changed by/on SAP  19981222 
SAP Release Created in