SAP ABAP IMG Activity PORG_V (Define Organizational Priorities)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   MM (Application Component) Materials Management
     MM_PRIO (Package) DFPS: Retrofit Requirement Prioritization
IMG Activity
ID PORG_V Define Organizational Priorities  
Transaction Code S_PCO_36000004   (empty) 
Created on 20050418    
Customizing Attributes PORG_V   Define Organizational Priorities 
Customizing Activity PORG_V   Define Organizational Priorities 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name PORG_V    

Use

In this IMG activity, you can define organizational priorities by assigning a key and a description for each organizational priority. The requirement priority is determined by the system from the combination of requirement urgency group and organizational priority.

You can define the organizational priority, if required, and specify additional factors for the requirement prioritization of your material requisitions. You can choose the following options:

  • In the IMG activity Assign Plants and Storage Locations, you can specify that the organizational priority is to be determined on the basis of the receiving storage location. To do so, assign the required plant/storage location combinations to each organizational priority.
  • If you want the organizational priority to be determined on the basis of plants, assign a plant without a specified storage location. All the storage locations of a plant then have the same organizational priority.
  • In the purchasing and reservation process and in material requirements planning, the Business Add-In (BAdI) Determination of the Organizational Priority During Requirement Prioritization (BADI_MM_PRIO_ORG) is also available. You can use this BAdI to define fields at header or item level that are evaluated when the organizational priority is determined. With the implementation of the BAdI, you can use a separate Customizing table to assign specific document types or item categories to the organizational priorities, for example.

If you use the industry solution for Defense Forces & Public Security, the organizational priority defines the importance that a force element has for prioritizing material requisitions. Since you assign the relevant organizational priorities to your force elements in the application, the system automatically assigns organizational priorities to plant/storage location combinations when the force elements are activated. You therefore do not need to make any manual entries in the IMG activity Assign Plants and Storage Locations.

Requirements

Standard settings

The standard system contains defined organizational priorities, which you can change or extend.

Activities

Example

Business Attributes
ASAP Roadmap ID 203   Establish Master Data 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG PORG_V 0 HLA0009510 Materials Management 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
PORG_V V - View SM30  
History
Last changed by/on SAP  20050418 
SAP Release Created in 600