Hierarchy

⤷

⤷

⤷

IMG Activity
ID | OLQW-OQWT | Inspection for Deadline Monitoring of Batches |
Transaction Code | S_ALR_87005365 | IMG Activity: OLQW-OQWT |
Created on | 19981222 | |
Customizing Attributes | OLQW-OQWT | Define inspections for deadline monitoring |
Customizing Activity |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | OLQW-OQWT |
In this step, you plan the creation of inspection lots by monitoring the deadlines of materials whose stocks are managed in batches.
The monitoring of deadlines involves two activities:
- changing the batch status when the following deadlines are reached:
- shell life expiration date
- date of the next recurring inspection
- creating an inspection lot before the date of the next recurring inspection expires and posting the materials to inspection stock
To create inspection lots automatically, the system starts a job that triggers the monitoring of deadlines at certain intervals:
- on a one-time basis
- at predefined intervals
Requirements
You must maintain the stocks of the monitored materials in batches.
An inspection type for inspection lot origin 09 must be active in the material master.
Activities
- Plan the jobs to create the inspection lots.
- Define report variants for triggering the inspections with the help of the deadline monitoring function.
- For each plant and material, define the intervals in which the deadlines are to be monitored.
Further notes
If the interval for the recurring inspection is defined in the material master, the date of the next recurring inspection is recorded when a batch is created.
You can enter the expiration date manually when you create a batch or the system can determine the date on the basis of the shelf life specified in the material master.
If the inspection type for inspection lot origin 09 (recurring inspection) is active in the material master, then a periodically executed program can identify all batches that qualify for the creation of an inspection lot, a status change or a transfer posting.
Jobs do not have a transport link; you must therefore plan the jobs in the production system.
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | OLQW-OQWT | 0 | HLA0006211 | Inspection Lot Creation |
Maintenance Objects
Maintenance object type |
History
Last changed by/on | SAP | 20000110 |
SAP Release Created in |