SAP ABAP IMG Activity OLQS-PVRS (Define Reduction Strategies for Scheduling)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       QI (Package) QM IMG and area menu
IMG Activity
ID OLQS-PVRS Define Reduction Strategies for Scheduling  
Transaction Code S_ALR_87004750   IMG Activity: OLQS-PVRS 
Created on 19981222    
Customizing Attributes OLQS-PVRS   Define reduction strategies for scheduling 
Customizing Activity OLQS-PVRS   Define Reduction Strategies for Scheduling 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name OLQS-PVRS    

In this step, you specify the reduction strategy to be used when the reduction measures are carried out on operations. Scheduling reduces the lead_time automatically if the basic dates given are not adhered to, that is if the scheduled dates lie outside the basic dates.

In this work step, you also define the reduction levels. The reduction takes place level by level no further than the level that you have specified in the control parameters.

You can specify a reduction strategy in every operation.

  • Reduction strategies

    You use the reduction strategies to determine how the operation lead time can be reduced step by step. You can enter a reduction strategy in every operation.

  • Reduction levels

    You can define up to six reduction levels for each reduction strategy. For every reduction level you can enter what is to be reduced and by how much.

The SAP system carried out reduction step by step no further than the reduction level specified in the scheduling parameters.

Note

The order/network is rescheduled after every reduction level. To improve performance we recommend that you keep the number of reduction steps to a minimum.

Standard settings

The reduction levels are predefined in the SAP standard package.

Activities

  1. You should define the reduction strategies.
  2. You should define the reduction levels for all the reduction strategies.

Business Attributes
ASAP Roadmap ID 203   Establish Master Data 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG OLQS-PVRS 0 HLA0006201 Inspection Planning 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
VC0C20_PP C - View cluster OPJS OLQS-PVRS Reduction Strategy for Scheduling 
History
Last changed by/on SAP  19990212 
SAP Release Created in