Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ QI (Package) QM IMG and area menu
IMG Activity
ID | OLQS-PROD | QM in Production |
Transaction Code | S_ALR_87004824 | IMG Activity: OLQS-PROD |
Created on | 19981222 | |
Customizing Attributes | OLQS-PROD | QM in Production |
Customizing Activity |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | OLQS-PROD |
The settings described in the subsection 'Quality Planning' / 'Basic Data' also apply to the quality planning activities in production; otherwise, no other special settings are necessary.
The settings described in the sections 'Quality Inspection' and 'Quality Notification' also apply to the quality management activities in production. In particular, refer to section inspection for a production order.
The inspection planning function for routings, rate routings and master recipes allows you to define inspection points and their corresponding partial quantities.
You can assign partial lots to the quantities of materials associated with certain inspection points (in a ratio of n:1). You can then make usage decisions for the partial lots and trigger automatic follow-up actions with each usage decision. If you manage your material stocks in batches, you can assign the partial lots to batches (in a ratio of n:1).
If you carry out inspections during production on the basis of inspection points, you can not only record the inspection results for an inspection lot, but you can also confirm the actual values for the production order. Make sure you consider the following settings for this purpose: The control key for the operation (confirmation) The settings for order type and order confirmation.
Depending on the production type and the desired functions, there are several settings that affect the production planning functions themselves. For details, refer to the Implementation Guides for Production and for production planning in the Process Industry.
Determine whether you want to intervene in the release of the production process with the help of the MM/PP status. Coordinate your activities with the production department and take an active part in defining the status.
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | OLQS-PROD | 0 | HLA0006210 | QM Control in Logistics |
Maintenance Objects
Maintenance object type |
History
Last changed by/on | SAP | 19990312 |
SAP Release Created in |