SAP ABAP IMG Activity FAGL_PLAN_ACT_SEC (Activate Plan Integration for Secondary Cost Elements)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   FI-GL (Application Component) General Ledger Accounting
     FAGL_PLANNING_EHP3 (Package) Planning in General Ledger Accounting
IMG Activity
ID FAGL_PLAN_ACT_SEC Activate Plan Integration for Secondary Cost Elements  
Transaction Code S_E38_98000024   (empty) 
Created on 20070613    
Customizing Attributes FAGL_PLAN_ACT_SEC   Activate Plan Integration for Secondary Cost Elements 
Customizing Activity FAGL_PLAN_ACT_SEC_OB   Activate Plan Integration for Secondary Cost Elements 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name FAGL_PLAN_ACT_SEC    

Use

In this activity, you can activate integrated planning for General Ledger Accounting from Overhead Cost Controlling (CO-OM) for secondary cost elements. In versions using integrated planning, plan data on secondary cost elements is also updated in or copied to General Ledger Accounting. However, the system does not update this plan data under the secondary cost element in the general ledger; instead, account determination determines a valid general ledger account - as is the case for the real-time integration of actual data.

Requirements

In the activity Define Account Determination for Real-Time Integration, you have defined account determination for the following plan transactions:

  • KSPB - Plan Assessment to CO-PA
  • KZPP - Planned Periodic Overhead
  • RKP2 - Planning Activities
  • RKP2 - Planning Secondary Costs
  • RKP7 - Planning Activity-Dependent Secondary Costs
  • RKP8 - Planning Settlement Costs
  • RKP9 - Planning Activity-Dependent Settlement Costs
  • RKPL - Plan Indirect Activity Allocation
  • RKPS - Secondary Planning with Template
  • RKPU - Plan Overhead Cost Assessment
  • RKPW - Secondary Order Cost Planning
  • RKPX - Activity-Dependent Secondary Order Cost Planning
  • RKPZ - Planned Credit for Overheads

Standard settings

With the standard settings, integrated planning only applies for primary cost elements.

Activities

Perform the activation in your development system and transport the change to your test and consolidation systems.

Caution:
The change is made independently of the client.

Example

After activation, plan assessment from Controlling forms part of integrated planning.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG FAGL_PLAN_ACT_SEC 0 HLA0001204 Planning 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
IMGDUMMY D - Dummy object FAGL_PLAN_ACT_SEC  
History
Last changed by/on SAP  20070807 
SAP Release Created in 600