SAP ABAP IMG Activity BADI_CPE_READ_UNTIL (BAdI: CPE Formula Evaluation Read Until Routine)
Hierarchy
PI_BASIS (Software Component) Basis Plug-In
   CA-GTF-CPE (Application Component) Commodity Pricing Engine
     CPE_FA_FE (Package) Commodity Pricing: Formula Assembly and Evaluation (ABAP)
IMG Activity
ID BADI_CPE_READ_UNTIL BAdI: CPE Formula Evaluation Read Until Routine  
Transaction Code S_BY3_13000010   (empty) 
Created on 20100915    
Customizing Attributes BADI_CPE_READ_UNTIL   BAdI: CPE Formula Evaluation Read Until Routine 
Customizing Activity BADI_CPE_READ_UNTIL   BAdI: CPE Formula Evaluation Read Until Routine 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name BADI_CPE_FE_READ_UNTIL_ROUTINE    

Use

This Business Add-In (BAdI) is used in the Commodity Pricing Engine (CA-GTF-CPE) component. You can use this BAdI to define a customer-specific logic (read until routine) according to which the system determines the point in time until which it should take market data for commodities or currencies into account.

This BAdI is called during the CPE formula evaluation process.

Requirements

You have defined the required routines and corresponding descriptions for the commodity pricing engine (CPE) in the Customizing activity Define CPE Routine for the submodule 16, Read Until Routine.

You have specified the valid read until routine in the Customizing activity Define Period Determination Rule.

Standard settings

For more information about the standard settings (filters, single or multiple uses), see the Enhancement Spot Element Definitions tab in the BAdI Builder (transaction SE18).

Activities

For information about implementing BAdIs as part of the Enhancement Concept, see SAP Library for SAP NetWeaver under BAdIs - Embedding in the Enhancement Framework.

Example

You have used the BADI_CPE_FE_PERIOD_DET_ROUTINE BAdI for a period determination routine to define the time period from March 1st to April 30th for evaluating stock market quotations. You create a sales order on March 10th and want the system to only read exchange rates up to March 10th so as not to have a negative influence on system performance. To do so, you define the current system date as the read-until date. The system does not evaluate exchange rates for the entire period until after April 30th.

See also

BAdI method documentation:
DETERMINE_READ_UNTIL_DATE

Business Attributes
ASAP Roadmap ID 257   Create User Exits 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Maintenance Objects
Maintenance object type E   Business Add-In - Definition 
History
Last changed by/on SAP  20100915 
SAP Release Created in 731